Banas Dairy lifts Gujarat French fry line from 2 to 5 tonnes an hour

By Potatopedia Editorial desk ·

Banas Dairy's expanded French fry plant at Sanadar, Deodar taluka, Gujarat, India, was inaugurated virtually by Prime Minister Narendra Modi on 30 Oct 2026. Line capacity rises from 2 to 5 tonnes an hour after work that began in Apr 2026. The project cost INR 51.65 crore.

Why it matters

Raising hourly output from 2 to 5 tonnes at a cooperative-owned fry plant adds French fry supply in western India. Because the dairy controls the chain from lab plantlets to processing, the extra line capacity should translate directly into larger contracted potato volumes from local growers.

Banas Dairy, the Banaskantha district milk cooperative in Gujarat, has expanded its French fry processing and packing line at Sanadar in Deodar taluka. Prime Minister Narendra Modi inaugurated the expansion virtually on 30 Oct 2026, as one of three Banas Dairy projects opened that day, according to DD India, the international channel of the public broadcaster Prasar Bharati.

How big is the expansion?

Output on the line goes from 2 tonnes to 5 tonnes an hour. Work started in Apr 2026, and the project cost INR 51.65 crore.

The fry plant made up a small share of the INR 407.56 crore of Banas Dairy projects opened on 30 Oct 2026. The largest was a cattle breeding and research center at Bhildi (INR 324.77 crore). The other was an automated storage and retrieval warehouse for UHT dairy products at Palanpur (INR 31.14 crore), with 11,000 pallet positions.

Where do the potatoes come from?

Banas Dairy runs its own potato chain. It develops plantlets in laboratories, grows seed crops, keeps potatoes in cold storage and then processes them. DD India describes this integrated model as unusual among cooperatives in India.

Speaking at the event in Banaskantha, the Prime Minister said the larger potato processing plant would allow more potatoes to be bought from farmers. Approved horticulture clusters in North Gujarat are also expected to benefit potato growers in Banaskantha and Sabarkantha, DD India reported.

What else was announced?

Foundation stones were laid for two Bio-CNG plants, at Tharad (75 tonnes of cattle dung a day) and Radhanpur (100 tonnes a day). These are part of the cooperative's wider push into biogas and organic fertilizer from dung and crop residue.

Key numbers

FigureValueDateSource
French fry line capacity before expansion2 tonnes an hour30 Oct 2026Source
French fry line capacity after expansion5 tonnes an hour30 Oct 2026Source
Cost of fry plant expansion51.65 INR crore30 Oct 2026Source
Total Banas Dairy projects inaugurated407.56 INR crore30 Oct 2026Source

Sources

Background on Potatopedia

Potato Processing Weekly · Every Tuesday

Get this every week

Plant openings, capacity, technology and raw-material supply in fries, chips, flakes and starch, sourced and in one email.

Also get our other newsletters

Free. One email to confirm; one-click unsubscribe. Privacy policy.

Corrections

No corrections to this story.

Seen an error? Tell us; corrections are noted here with their date.

Clearly labelled sponsors. Never paid rankings. Never paid facts. Our editorial standards